ETAU ETAU ETAU

New BMB


MONS | In progress
Rest and nursing home |
Assisted living residence

Construction |
Full mission

120 beds
23 apartments
Low energy : K 25
Estimated : 12.000.000 € HTVA

From surrounding site's typology follows the desire to create a residential complex corresponding to the image of scattered buildings, low height with inclined roof and perpendicular to the Vilaine street creating a dialogue with the neighbouring houses.
5 pavilions (4 for the use of the rest home and one used as assisted living services) are connected by an internal street, which provides and regulates all functional flows.

Technical features:
Forced-air mechanical ventilation | Geothermal probe (3500m) | Heat Pump | Solar thermal DHW heating (173m2) | recycling rainwater | airtightness= 1.

Subcontracting: Structure engineering (ST sa) | Special building techniques and EPB (TSPEC sprl)

PO : PSAC Mons
Contract : public
Financial support : la Wallonie
RNH : 105 beds
SS : 15 beds
DC : 15 places
ALR : 23 apartments
Subcontracting : I&S sprl I St sa I COREPRO
Pierre Debaeke Architecte, associé jusqu'en 2013 - Marie-Sophie Hubert Architecte, Damien Daive Architecte


By continuing your visit, you agree to our privacy policy and the use of Cookies.